Case 2 Business Issue: Power Generation equipment manufacturer had divested a portion of their business. Plant facilities were vacated and client needed to align the facility to meet expected growth. Approach Used: Utilized Simplified Systematic Layout Planning (SSLP) techniques to strategically align plant site utilization with product line growth and technical requirements. Results: Relocated low-tech subassemblies to low cost facilities and utilized premium floor space for high-end production and assembly. Allowed client to position itself for growth and addition of new product offering.